Current Transformer Selection: 6 Checks Before You Order

factory hv lv cabinet row

Most switchgear protection problems get blamed on the relay. The relay only acts on what the current transformer sends it. A CT with the wrong ratio, burden or thermal rating makes a correctly set relay trip late — or not at all. These are the six checks we run before a CT is released for production.

MV switchgear panel row where current transformer selection is fixed at the design stage
Current transformer selection is fixed at the design stage — changing it later means changing the panel.

Why CT Selection Decides Protection Performance

A current transformer does two jobs: it scales primary current down to a level the relay can read, and it isolates the relay from the primary circuit. Both jobs have limits. Past rated current the core saturates; past rated burden the secondary voltage collapses; past the thermal rating the winding fails.

Once a limit is crossed, the secondary current is no longer a copy of the primary current, and the relay decides on distorted data. That is why the CT is the first element of the protection chain, not a commodity picked by ratio.

Check 1 — Ratio and Accuracy Class

The common mistake is sizing the CT from cable ampacity. A 630 A feeder does not need a 630/5 A CT. Three constraints matter: the primary current must sit in a usable part of the relay range, the secondary at rated load must stay above pickup, and the ratio must leave headroom for the high-set element.

As a rule for MV feeders, take 1.2 to 1.5 times design load current. A 400 A design load points to 500/5 A or 600/5 A, not 400/5 A. Secondary is 5 A in most IEC panels, 1 A where runs are long or relay burden is low.

Accuracy class follows duty. Metering cores take 0.5 or 0.5S; protection cores take 5P10, 5P20 or 10P20. A 5P10 core holds 5 percent composite error up to ten times rated primary current — on a 500 A CT that is only 5 kA, so a 25 kA fault level demands a higher factor, calculated from the relay setting.

Burden in VA, in Plain Terms

Burden is what the secondary must drive: relay input, test block, wiring, interposing transformers. Rated burden must exceed that total at the stated class. A numeric relay draws 0.1 to 0.5 VA, a 100 m 5 A cable run about 0.5 to 1 VA, a test block 0.1 VA. Add them and specify at least 25 percent margin — typically 15 VA class 0.5 for metering, 15 VA 5P20 for protection.

Check 2 — Thermal and Dynamic Ratings

Ith and Idyn decide whether the CT survives a fault rather than merely measuring it. Ith is stated for 1 or 3 seconds and must exceed the prospective fault current for the clearing time. Idyn is normally 2.5 × Ith at 50 Hz.

For 25 kA on a 500 A CT, specify Ith 25 kA/1 s and Idyn 63 kA as a minimum. A 20 kA/1 s unit passes on paper and fails on the first through-fault. Ask for the type-test certificate, not the catalogue column.

Outgoing MV cabinet with current transformers mounted behind the busbar for feeder protection
Outgoing feeder cabinet: the CT sits between busbar and cable compartment, so its mounting style follows the panel layout.

Check 3 — Mounting, Insulation and Clearance

Window CTs pass the primary conductor through the core and suit single-core cable or busbar. Bar-primary CTs carry the primary inside the casting for a compact block. Split-core units are for retrofits where the cable cannot be cut. Each style changes the clearance you need and how the secondary terminates.

Insulation level must match the panel, not the catalogue default. For 11 kV that means 12 kV rated voltage, 28 kV power-frequency withstand and 75 kV impulse; for 33 kV, 36 kV with 70 kV and 170 kV. A lower-rated CT inside a higher-rated panel is a weak point no panel type test will reveal.

Confirm partial discharge as well. A cast-resin CT can pass a one-minute withstand test and still discharge at 1.1 × Um/√3 in service, eroding the casting from inside. Ask for a PD reading below 10 pC at that voltage, measured on the finished unit.

SF6 load break switch assembly used with current transformers inside a 12 kV RMU
Inside a 12 kV RMU the CT shares a tight compartment with the load break switch — clearance is a layout decision.

The Six Checks in One Table

Check Parameter Typical value to specify What fails if it is wrong
1 Ratio 1.2–1.5 × design load current; 5 A or 1 A secondary Relay under-reads load or loses resolution
2 Accuracy class 0.5 / 0.5S metering; 5P20 protection Metering error, saturation on close-in faults
3 Burden ≥ 1.25 × (relay + wiring + test block) Voltage collapse, distorted current to relay
4 Ith / Idyn ≥ prospective fault current; Idyn ≈ 2.5 × Ith Winding damage on the first through-fault
5 Insulation and PD 12 kV/28/75 kV or 36 kV/70/170 kV; PD < 10 pC Flashover at the CT, internal erosion
6 Secondary wiring Shielded cable, shorting test block, S1/S2 marked Open secondary, wrong polarity

Two wiring rules belong in the same pass. Polarity: P1 faces the busbar side and S1 lands on the relay’s marked terminal, or directional elements operate backwards. And the secondary must never be opened under load — short the core at the test block first.

For the wider panel context, our MV switchgear components guide shows how the CT sits with bushings, earthing switches and relays; relay-side settings are in the protection relay guide; heat is covered in our temperature rise test notes. Run these checks before routine and type tests are booked — changing a CT afterwards means repeating them.

Six Buyer Questions

1. Can I use a 5P10 CT on a 25 kA system?
No, not on a 500 A CT. Ten times rated primary is 5 kA; check the fault level from the single-line diagram before accepting the core.

2. Is a higher burden rating always better?
No. A 30 VA core in a metering circuit costs accuracy at light load. Match the connected load with about 25 percent margin.

3. 1 A or 5 A secondary?
1 A where secondary runs exceed roughly 30 m or relay burden is very low. 5 A stays the default for short runs in IEC panels.

4. How do I verify the CT before energisation?
Primary injection at low current confirms ratio and polarity together; secondary injection only proves the relay. Do both on new CTs.

5. Can a split-core CT replace a window CT in a retrofit?
Yes, if the class and burden you need exist in split-core format and the core closes fully. A partly closed core loses accuracy that no calibration fixes.

About Electric-GS

Electric-GS is an OEM/ODM switchgear factory in Yueqing, Zhejiang, producing ring main units, gas-insulated and air-insulated switchgear, vacuum circuit breakers, load break switches and LV/MV panels from 11 kV to 33 kV. We select and test current transformers as part of the panel, so ratio, burden and thermal ratings are checked against the relay settings before release.

Send your single-line diagram and relay settings to info@electric-gs.com or WhatsApp +86 135 8897 8050 and we will return a CT specification you can compare line by line. Our sister sites electricgs.com and electric-cn.com carry the wider range and Chinese documentation.