Winding resistance is one of the few tests that shows what is happening inside a transformer before you energize it. A loose joint, a burned tap contact, or a shorted turn all appear as a resistance that does not match the design value or does not match the other phases. The test takes under an hour on a distribution unit and can save weeks of outage time.
These are the five checks we run on every unit before dispatch, plus the numbers to compare against and the mistakes that cause false passes.
Why Winding Resistance Matters
DC resistance measures the copper path directly. Faults that heating and ratio tests miss usually show up here: loose busbar joints, a tap contact that is not seated, a broken strand in a multi-strand conductor, or a shorted turn. Because the useful information is a ratio between phases and between taps, the test does not need absolute accuracy — it needs consistency: same instrument, same temperature, same lead arrangement.
Copper resistance rises about 0.4% per 1 °C, so a unit still at 80 °C from the drying oven reads roughly 25% higher than at 20 °C. Record the winding temperature at the moment of measurement, correct readings to 75 °C, and wait until two readings ten minutes apart differ by under 2% before you trust the data.
Check 1: Phase Balance Within 2%
After temperature correction, the three phases should sit within 2% of each other. This limit is generous rather than strict — short, thick windings on larger units balance better than small ones. Use a four-wire milliohm meter, keep leads short, and clip onto clean bare metal, never onto paint or grease.
| Parameter | Typical Limit | What It Indicates When Exceeded |
|---|---|---|
| Phase-to-phase balance | ≤ 2% | Loose joint, broken strand, unequal winding length |
| Same tap, three phases | ≤ 2% | Tap contact resistance or wrong tap connection |
| Tap-to-tap progression | No jump > 5% | Open or burned tap contact |
| Against factory value | ≤ 5% corrected | Winding damage, moisture, oxidation |
| Repeatability at one temperature | ≤ 1% | Clip contact or drifting instrument |
When one phase is high but ratio and insulation tests pass, check the external connection first. Half the “winding faults” we investigate turn out to be a clip on painted steel or a terminal not fully tightened.
Check 2: Tap-by-Tap Consistency
Measure every tap position, not just the nominal one. The pattern should be smooth: resistance changes slightly as turns are added or removed, and it never jumps. A 5% jump between adjacent taps means a contact is not seated; identical readings on two different taps usually mean the changer did not actually move. Rolling contact changers in oil can read high on the first operation and settle afterward, so operate them several times before measuring. Label every reading with its tap position — untagged data cannot be used.
Check 3: Comparison With Factory Data
A reputable factory issues resistance values at 75 °C for each winding and each tap. Deviations within 5% are normal after transport and storage; beyond 10% needs an explanation before energizing. If the report is missing, use the design relationship instead: HV and LV resistance scale inversely with the square of the turns ratio for the same power base. If the numbers do not follow that relationship, verify the vector group and connection before drawing conclusions.

A distribution transformer set up for resistance and ratio testing at our workshop. Leads are clipped to clean terminals, the tank is grounded, and the tap position is recorded before the first reading.
Check 4: Instrument, Leads and Safety
Use a four-wire Kelvin milliohm meter, not a two-wire multimeter. Two-wire readings include lead resistance — roughly 10 mΩ per metre of ordinary cable — which can mask a real 5 mΩ change on a small winding. Keep current and voltage clips separate and clean.
Discharge before and after. A winding behaves like a large inductor; interrupting DC current produces a voltage spike that can damage the instrument and injure the operator. Use the meter’s discharge function, wait for the reading to fall to zero, then move leads. Ground the tank, keep the guard circuit connected as the manufacturer specifies, and on serviced units follow lockout procedure and review the oil test results first, because moisture makes the winding more sensitive to polarisation.

The tap changer is the second most common source of imbalance. Every position gets its own reading and its own label.
Check 5: Sequence and Record Keeping
Run resistance after insulation resistance and before ratio and vector group checks. It is a low-energy test, so nothing is stressed, and when it passes the ratio test becomes a formality. For repeat tests years later, the same reference temperature and the same tap positions must be used or the trend is lost. Keep raw readings, temperature, instrument serial number and tap position in one table — the same discipline we apply to impedance data.

Factory reports should list resistance per winding at 75 °C. Ask for it before shipment — far easier than after installation. Our tap changer checks follow the same pre-energizing sequence.
FAQ
What is a normal winding resistance value?
On a 1 MVA, 11 kV distribution transformer, HV resistance is often a few ohms and LV is in the milliohm range. Balance between phases and comparison with factory data matter more than the absolute number.
Can I use a normal multimeter?
Not reliably. Lead resistance and low resolution hide milliohm differences. Use a four-wire meter with at least 1 µΩ resolution.
Why do readings keep changing?
Usually the winding is still cooling, the clips are unstable, or the meter is still auto-ranging. Wait for stability before recording.
Does a 3% imbalance mean the transformer is faulty?
Not necessarily. Re-check external connections and temperature correction. If it persists on a clean second test, it needs investigation before energizing.
How long does the test take?
Roughly 10 to 15 minutes per winding once the temperature is stable, plus time for each tap. Large power transformers with long time constants take considerably longer.
Before or after oil filling?
Both are useful: before filling the reading reflects the dry winding, after filling it reflects the as-installed condition. Compare the two to confirm nothing changed during assembly.
About Electric-GS
Electric-GS is an OEM/ODM manufacturer of distribution transformers, compact substations, RMU and MV switchgear in Yueqing, China. Every unit ships with a factory test report covering resistance, ratio, impedance and insulation, and our engineers can review your field readings against design values. Contact info@electric-gs.com or WhatsApp +86 135 8897 8050. Related: LV and MV switchgear assemblies from our sister site, and custom electrical equipment for project enquiries.